分布式能源项目地基处理优化及创新
瞿鸣慧,程和平
华东电力设计院有限公司,上海市,200063; 华润电力,广东省深圳市,518052
摘要:本工程建设 2×30MW 级燃气分布式能源项目,并预留扩建 2×30MW 级的条件。厂址
位于郑州航空港经济综合实验区西南片区。据本工程地质条件并结合主要建(构)筑物的属性,
确定地基处理方案。在确保安全可靠的前提下,充分考虑场地特点,因地制宜,进行地基处
理优化及创新,制定最合理、经济的方案。
关键词:地基处理;强夯
Optimization and Innovation of Foundation Treatment for
Distributed Energy Projects
Qu minghui, Cheng heping
ECEPDI, Shanghai, 200063; CR Power, Shenzhen Guangdong Province,518052
Abstract: The project constructed 2 × 30MW gas distributed energy project, and reserved for
expansion 2 × 30 MW level. The project is located in the southwest of Zhengzhou Airport
Economic Comprehensive Experimental Zone. According to the geological conditions of the
project and the properties of main buildings (structures), the foundation treatment scheme is
determined. On the premise of ensuring safety and reliability, fully consider the site characteristics,
adjust measures to local conditions, optimize and innovate the foundation treatment, and formulate
the most reasonable and economic scheme.
Key words: Foundation treatment;Dynamic compaction
1.工程概况
1.1 基本情况
该分布式能源项目位于郑州航空港经济综合实验区西南片区,核准容量 108MW,供电能
力 6.5 亿 kWh/年,最大供热能力 216 t/h,工业蒸汽 188 万 GJ/年,采暖供热 58 万 GJ/年。
本期建设2×31.5MW燃气轮发电机组+1×8.6MW背压汽轮机组+1×10.6MW纯凝汽轮发电机
组,装机容量 82.2MW。
1.1.1 项目原貌
项目厂址呈较为规则的矩形,南北长约 290m,东西宽约 170m。自然场地标高为 147.60~
163.50m(1956 黄海高程系统)。场地有起伏,地形整体为西高东低,北高南低,原为土丘,
因取土形成高度约 6m 陡坎,后部分区域回填粉土、粉质黏土掺杂建筑垃圾及少量生活垃圾。
厂址周边市政道路、管网基本形成(见图 1)。